Company CNG offers a comprehensive solution to build your future home. By signing the contract agreement for construction of our company - all the care in design, consultation and construction of your future home, we commit ourselves. We guarantee the quality of work performed in a short time and honesty in a relationship with the customer. SSF CNG on the construction market since 2007. Our company employs highly qualified superintendents of construction education and experience, we have its logistical base, worked out a strong and mutually beneficial relationships with our suppliers of building materials. The construction process is controlled by the architect and design engineer.
Prices for construction of houses - construction of houses, cottages, villas, country houses in Kiev and the region.
The cost of building a cottage (the cost of works and materials). The cost of our services for the construction of the cottage - 15% of the cost of building the house (the cost of works and materials). For that money you get quality work, and guarantees a minimum of your time in the participation of the construction process. Roughly, this is expressed in figures: Complete 1 (Civil works) Site preparation for construction, the zero cycle, the erection of walls, partitions, ceilings, Roofing, gutters and coatings. 2400 - 3500 grn/m2 * Komplektatsiya1 (Civil works) (Price valid until 31.03.2010)
| exterior wall |
tile "Poroterm 38 P + W" on thermoinsulating solution |
|
|
foundation |
Pillow monolithic reinforced concrete, the walls of the blocks FBS |
|
|
overlap |
ZHB monolithic or prefabricated panels (project) |
|
partitioning |
ceramic bricks 2 NF 120 mm |
|
|
|
roofing |
Exclusive composite tiles coated with crumbs of natural stone |
|
|
drain |
plastic |
|
|
windows, balcony doors |
– |
|
|
garage doors |
– |
|
|
exterior trim |
– |
|
|
internal walls |
ceramic bricks 2 NF |
|
|
Floors |
Concrete slab floor 1 second (ground floor) |
|
|
exterior doors |
– |
|
|
plumbing |
– |
|
|
sewage |
sewer pipe under the slab floor 1 second (ground) floor |
|
|
heating |
– |
|
|
ventilation |
ventilation device in the brick walls |
|
|
Electricity |
– |
|
|
|
staircase |
– |
|
|
design documentation |
house project with links to the site and Geology |
|
|
alignment |
assistance in obtaining a building permit (in the Kiev region) |
|
DETAILS ON FITMENT 1: Project work. - Project of the cottage, linking the project to the site, minor changes to the requirements of the customer, if necessary - revised in line with energy saving and rationalization of constructive solutions. - Assistance in obtaining a building permit, a passport facility (Kiev region). - Adaptation of the basement under the geology section. - Supervision of the architect for the building. Device foundations. - A breakdown of the axes, the binding of the house. - Development of soil excavated. - Further development of the soil by hand. - Installation of crushed stone base with a seal of 100 mm. - Installation of concrete preparation of 100 mm. - Installation of the foundation strip height of 300 mm reinforced with 2 reinforcement mesh depth of 1.2 meters (formwork, metal frame, concrete). - Installation of foundation walls of the blocks FBS or monolithic ZHB. - The device is a monolithic zone under the main walls. - Installation of vertical obmazochnoy waterproofing in 2 layers. - Insulation of walls of the foundation. - Backfilling with layer multiplexing. - Crushed stone sub-crust under the slab floor of the first (ground) floor. - Setting of sewer pipes under the slab floor. - The device is a monolithic ZHB floor plate 1 st (basement) floor. Masonry walls and partitions, installation of monolithic zones, installation of ceilings. - Laying the warm exterior walls * of the ceramic block "POROTERM 38 P + W" - durable and environmentally friendly material from Europe. * - The walls do not require insulation (Therefore, according to new rules insulation of buildings, DBN B.2.6-31: 2006). - Masonry internal walls of ceramic bricks 2NF thickness 250-380mm. - Installation of ceiling tiles from the ZHB, the device monolithic sections. - Installation of ceiling under the attic of the wooden beams (in the attic roof). - Brick masonry chimney of brick type M-125. - Installation of monolithic ZHB jumpers. - Masonry walls of ceramic bricks 2NF thickness of 120 mm. - The device is a monolithic reinforced concrete belts. - Installation of prefabricated bridges. - Thermal insulation of thermal bridges in places jumpers, belts, floor slabs. Roofing. - Ognebiozaschita wooden elements. - Installation of the truss system. - The device evrobarera JUTA, parobarera, insulation ISOVER 200mm (in the roof tops). - Installation of an exclusive metal "METROBOND" or shingles (your choice). - Installation of plastic gutter system. - Soffit overhang roof siding. Organization of the construction site. - Placement of building cabins, mortar site, welding generator. - Provision of building a cottage with all the necessary tools and mechanisms. - Debris removal on completion of works. The contract does not change until completion. Payment is made uniformly in the course of the construction schedule of financing. Payment in UAH according to the exchange on the date of payment. Perhaps the implementation of one of the stages of construction (foundations, ground part, the roof). This is an actual construction cost for the completion of the entire territory of Ukraine except for seismic regions (the Crimea and Carpathians), high floor of a clean floor to ceiling not exceeding 3 meters, and provided a simple geology (solid strip foundation depth of 1.2 m). In terms of other materials and design solutions - the cost is adjusted accordingly. Timeline for implementation of the project 3 - 6 months depending on the size of the object. Guarantee works - 2 years! A good guarantee of quality of work completed, will serve as feedback from our customers. Welcome to the show built objects and objects at the implementation stage. And finally, 2 important rules in the design and construction: 1. One dollar saved means to the project - $ 10 additional cost in construction. 2. Construction is not cheap, cheap construction - a sad result (as the majority of private cottages on display today at the sale in our state).
Complete 2 (House ready for finishing) Site preparation for construction, the zero cycle, the erection of walls, partitions, ceilings, internal staircases, plumbing and engineering services, power and low voltage cables, the device and the roof coverings, installation of windows and exterior doors, garage doors, exterior trim at home, finishing the preparatory work. 3800 - 4900 grn/m2 * Complete 2 (House, ready for finishing)
exterior wall |
tile "Poroterm 38 P + W" on thermoinsulating solution + warm outer plaster Teplover " |
|
|
foundation |
Pillow monolithic reinforced concrete, the walls of the blocks FBS |
|
|
overlap |
ZHB monolithic or prefabricated panels (project) |
|
partitioning |
ceramic bricks 2 NF 120 mm |
|
|
roofing |
Exclusive composite tiles coated with crumbs of natural stone |
|
|
drain |
plastic |
|
|
windows, balcony doors |
of metal-profile energy-saving glazing |
|
|
garage doors |
sectional, insulated |
|
|
exterior trim |
mineral plaster, facade tiles, decorative elements foam |
|
|
internal walls |
plaster enovation |
|
|
Floors |
finishing screed for laying flooring |
|
|
exterior doors |
Metal |
|
|
plumbing |
layout of hot and cold water, plastic pipes (well calculated separately) |
|
|
sewage |
Sewer Plastic Pipes (local system - septic tank, filter well calculated optional) |
|
|
heating |
Metal pipe hot water heating, radiators, water heated floors in bathrooms |
|
|
ventilation |
ventilation device in the brick walls |
|
|
Electricity |
copper wiring of power cables |
|
|
|
staircase |
ladders of metal sheeting under the tree |
|
|
design documentation |
house project with links to the site and Geology |
|
|
alignment |
assistance in obtaining a building permit (in the Kiev region), entering houses in operation |
|
DETAILS ON FITMENT 2: Project work and coordination of construction. - Project of the cottage, linking the project to the site, minor changes to the requirements of the customer, if necessary - revised in line with energy saving and rationalization of constructive solutions. - Assistance in obtaining a building permit, a passport facility (Kiev region). - Adaptation of the basement under the geology section. - Supervision of the architect for the building. Device foundations. - A breakdown of the axes, the binding of the house. - Development of soil excavated. - Further development of the soil by hand. - Installation of crushed stone base with a seal of 100 mm. - Installation of concrete preparation of 100 mm. - Installation of the foundation strip height of 300 mm reinforced with 2 reinforcement mesh depth of 1.2 meters (formwork, metal frame, concrete). - Installation of foundation walls of the blocks FBS or monolithic ZHB. - The device is a monolithic zone under the main walls. - Installation of vertical obmazochnoy waterproofing in 2 layers. - Insulation of walls of the foundation. - Backfilling with layer multiplexing. - Crushed stone sub-crust under the slab floor of the first (ground) floor. - Setting of sewer pipes under the slab floor. - The device is a monolithic ZHB floor plate 1 st (basement) floor. Masonry walls and partitions, installation of monolithic zones, installation of ceilings. - Laying the warm exterior walls * of the ceramic block "POROTERM 38 P + W" - durable and environmentally friendly material from Europe. * - The walls do not require insulation (Therefore, according to new rules insulation of buildings, DBN B.2.6-31: 2006). - Masonry internal walls of ceramic bricks 2NF thickness 250-380mm. - Installation of ceiling tiles from the ZHB, the device monolithic sections. - Installation of ceiling under the attic of the wooden beams (in the attic roof). - Brick masonry chimney of brick type M-125. - Installation of monolithic ZHB jumpers. - Masonry walls of ceramic bricks 2NF thickness of 120 mm. - The device is a monolithic reinforced concrete belts. - Installation of prefabricated bridges. - Thermal insulation of thermal bridges in places jumpers, belts, floor slabs. Roofing. - Ognebiozaschita wooden elements. - Installation of the truss system. - The device evrobarera JUTA, parobarera, insulation ISOVER 200mm (in the roof tops). - Installation of an exclusive metal "METROBOND" or shingles (your choice). - Installation of plastic gutter system. - Soffit overhang roof siding. Facade work - Masonry facade environmental insulation plaster "Teplover. - Decorative plaster, facade cladding and ground tiles, ornamental elements of the facade of polystyrene. - Installation of windows and balcony doors of metal-profile KBE with energy saving glazing. - Installation of metal entrance doors and sectional garage doors. Engineering Systems - Installation of water systems, wiring for hot and cold water composite pipes. - Installation of the sewage system of metal plastic pipes. - Installation of heating system, the device internal networks (metal-pipe hot water heating, radiators, water heated floors in the bathrooms) - Electrical - wiring copper power cables. Internal work - Thermal insulation of floors, finishing screed device for laying floor coverings. - Plaster walls for final finishing. - Plaster ceilings for final finishing. - Installation of the metal framework under the stairs trim a tree. Organization of the construction site. - Placement of building cabins, mortar site, welding generator. - Provision of building a cottage with all the necessary tools and mechanisms. - Debris removal on completion of works. The contract does not change until completion. Payment is made uniformly in the course of the construction schedule of financing. Payment in UAH according to the exchange on the date of payment. Perhaps the implementation of one of the stages of construction (foundations, ground part, the roof). This is an actual construction cost for the completion of the entire territory of Ukraine except for seismic regions (the Crimea and Carpathians), high floor of a clean floor to ceiling not exceeding 3 meters, and provided a simple geology (solid strip foundation depth of 1.2 m). In terms of other materials and design solutions - the cost is adjusted accordingly. Implementation period 6 - 12 months depending on the size of the object. Guarantee works - 2 years! A good guarantee of quality of work completed, will serve as feedback from our customers. We invite you to view the completed projects and objects at the implementation stage. And finally, 2 important rules in the design and construction: 1. One dollar saved means to the project - $ 10 additional cost in construction. 2. Construction is not cheap, cheap construction - a sad result (as the majority of private cottages on display today at the sale in our country
Complete set 3 (house with fixtures and equipment) Floors, walls, ceilings, stairs, installation of interior doors, installation of equipment for water supply, sewerage, heating, ventilation, installation of electrical and low voltage systems. from 5000 grn/m2 *
Price depends on the complexity of the project and the materials used. Depending on the amount of work and many objective reasons, which are determined only after a thorough acquaintance with the subject, these prices may vary. Construction time "box" cottage with a foundation - from 3 months. Territory. Enclosure area (fence, gates), small form, benches, paths, driveways, laying turf, planting trees, shrubs, flower beds breakdown, the lighting device area. from 8000 USD / Weaving **
Note: * - Per square meter total area of the house (the sum of the total area). ** - Per hundred square meters (100 m2) plot. Payment is made in the national currency of Ukraine, in stages in accordance with the schedule of funding, signed by the Customer and the Company. And finally, 2 important rules in the design and construction: 1. One dollar saved means to the project - $ 10 additional cost in construction. 2. Construction is not cheap, cheap construction - a sad result (as the majority of private cottages on display today at the sale in our state). We offer quality at a reasonable price |