Сonstruction
Construction of cottages
Foundation
Walling
Roof
Finishing facades
General Contractor
Budgeting
Windows and Doors
Renovation
Repair of apartments
Repair of offices
Repair of non-residential premises
Completed projects
Landscape design
Landscaping
Cosy garden
Noble park
Noble estate
Prices for landscaping
Planning
Architectural design
Technical supervision
Legal support
Examination
Question-Answer
Главная :: CNG :: Cost of work Search

Cost of construction work - building houses,

 cottages, villas, country houses in Kiev and region


 

     Company CNG offers a comprehensive solution to build your future home. By signing the contract agreement for construction of our company - all the care in design, consultation and construction of your future home, we commit ourselves. We guarantee the quality of work performed in a short time and honesty in a relationship with the customer.
    SSF CNG on the construction market since 2007. Our company employs highly qualified superintendents of construction education and experience, we have its logistical base, worked out a strong and mutually beneficial relationships with our suppliers of building materials. The construction process is controlled by the architect and design engineer.

Prices for construction of houses - construction of houses, cottages, villas, country houses in Kiev and the region.


The cost of building a cottage (the cost of works and materials).
The cost of our services for the construction of the cottage - 15% of the cost of building the house (the cost of works and materials). For that money you get quality work, and guarantees a minimum of your time in the participation of the construction process. Roughly, this is expressed in figures:
Complete 1 (Civil works)
Site preparation for construction, the zero cycle, the erection of walls, partitions, ceilings, Roofing, gutters and coatings.
2400 - 3500 grn/m2 *
Komplektatsiya1 (Civil works)
(Price valid until 31.03.2010)

exterior wall

tile "Poroterm 38 P + W" on thermoinsulating solution

foundation

Pillow monolithic reinforced concrete, the walls of the blocks FBS

overlap

ZHB monolithic or prefabricated panels (project)

partitioning

ceramic bricks 2 NF 120 mm

roofing

Exclusive composite tiles coated with crumbs of natural stone

drain

plastic

windows, balcony doors

garage doors

exterior trim

internal walls

ceramic bricks 2 NF

Floors

 Concrete slab floor 1 second (ground floor)

exterior doors

plumbing

sewage

sewer pipe under the slab floor 1 second (ground) floor

heating

ventilation

ventilation device in the brick walls

Electricity

staircase

design documentation

house project with links to the site and Geology

alignment

assistance in obtaining a building permit (in the Kiev region)

 

DETAILS ON FITMENT 1:
Project work.
- Project of the cottage, linking the project to the site, minor changes to the requirements of the customer, if necessary - revised in line with energy saving and rationalization of constructive solutions.
- Assistance in obtaining a building permit, a passport facility (Kiev region).
- Adaptation of the basement under the geology section.
- Supervision of the architect for the building.
Device foundations.
- A breakdown of the axes, the binding of the house.
- Development of soil excavated.
- Further development of the soil by hand.
- Installation of crushed stone base with a seal of 100 mm.
- Installation of concrete preparation of 100 mm.
- Installation of the foundation strip height of 300 mm reinforced with 2 reinforcement mesh depth of 1.2 meters (formwork, metal frame, concrete).
- Installation of foundation walls of the blocks FBS or monolithic ZHB.
- The device is a monolithic zone under the main walls.
- Installation of vertical obmazochnoy waterproofing in 2 layers.
- Insulation of walls of the foundation.
- Backfilling with layer multiplexing.
- Crushed stone sub-crust under the slab floor of the first (ground) floor.
- Setting of sewer pipes under the slab floor.
- The device is a monolithic ZHB floor plate 1 st (basement) floor.
Masonry walls and partitions, installation of monolithic zones, installation of ceilings.
- Laying the warm exterior walls * of the ceramic block "POROTERM 38 P + W" - durable and environmentally friendly material from Europe. * - The walls do not require insulation (Therefore, according to new rules insulation of buildings, DBN B.2.6-31: 2006).
- Masonry internal walls of ceramic bricks 2NF thickness 250-380mm.
- Installation of ceiling tiles from the ZHB, the device monolithic sections.
- Installation of ceiling under the attic of the wooden beams (in the attic roof).
- Brick masonry chimney of brick type M-125.
- Installation of monolithic ZHB jumpers.
- Masonry walls of ceramic bricks 2NF thickness of 120 mm.
- The device is a monolithic reinforced concrete belts.
- Installation of prefabricated bridges.
- Thermal insulation of thermal bridges in places jumpers, belts, floor slabs.
Roofing.
- Ognebiozaschita wooden elements.
- Installation of the truss system.
- The device evrobarera JUTA, parobarera, insulation ISOVER 200mm (in the roof tops).
- Installation of an exclusive metal "METROBOND" or shingles (your choice).
- Installation of plastic gutter system.
- Soffit overhang roof siding.
Organization of the construction site.
- Placement of building cabins, mortar site, welding generator.
- Provision of building a cottage with all the necessary tools and mechanisms.
- Debris removal on completion of works.
The contract does not change until completion. Payment is made uniformly in the course of the construction schedule of financing.
Payment in UAH according to the exchange on the date of payment.
Perhaps the implementation of one of the stages of construction (foundations, ground part, the roof).
This is an actual construction cost for the completion of the entire territory of Ukraine except for seismic regions (the Crimea and Carpathians), high floor of a clean floor to ceiling not exceeding 3 meters, and provided a simple geology (solid strip foundation depth of 1.2 m). In terms of other materials and design solutions - the cost is adjusted accordingly.
Timeline for implementation of the project 3 - 6 months depending on the size of the object.
Guarantee works - 2 years! A good guarantee of quality of work completed, will serve as feedback from our customers. Welcome to the show built objects and objects at the implementation stage.
And finally, 2 important rules in the design and construction:
1. One dollar saved means to the project - $ 10 additional cost in construction.
2. Construction is not cheap, cheap construction - a sad result (as the majority of private cottages on display today at the sale in our state).

Complete 2 (House ready for finishing)
Site preparation for construction, the zero cycle, the erection of walls, partitions, ceilings, internal staircases, plumbing and engineering services, power and low voltage cables, the device and the roof coverings, installation of windows and exterior doors, garage doors, exterior trim at home, finishing the preparatory work.
3800 - 4900 grn/m2 *
Complete 2 (House, ready for finishing)


exterior wall

tile "Poroterm 38 P + W" on thermoinsulating solution + warm outer plaster Teplover "

foundation

Pillow monolithic reinforced concrete, the walls of the blocks FBS

overlap

ZHB monolithic or prefabricated panels (project)

partitioning

ceramic bricks 2 NF 120 mm

roofing

 Exclusive composite tiles coated with crumbs of natural stone

drain

plastic

windows, balcony doors

of metal-profile energy-saving glazing

garage doors

sectional, insulated

exterior trim

mineral plaster, facade tiles, decorative elements foam

internal walls

plaster enovation

Floors

finishing screed for laying flooring

exterior doors

Metal

plumbing

layout of hot and cold water, plastic pipes (well calculated separately)

sewage

Sewer Plastic Pipes (local system - septic tank, filter well calculated optional)

heating

 Metal pipe hot water heating, radiators, water heated floors in bathrooms

ventilation

ventilation device in the brick walls

Electricity

copper wiring of power cables

staircase

ladders of metal sheeting under the tree

design documentation

 house project with links to the site and Geology

alignment

assistance in obtaining a building permit (in the Kiev region), entering houses in operation

DETAILS ON FITMENT 2:
Project work and coordination of construction.
- Project of the cottage, linking the project to the site, minor changes to the requirements of the customer, if necessary - revised in line with energy saving and rationalization of constructive solutions.
- Assistance in obtaining a building permit, a passport facility (Kiev region).
- Adaptation of the basement under the geology section.
- Supervision of the architect for the building.
Device foundations.
- A breakdown of the axes, the binding of the house.
- Development of soil excavated.
- Further development of the soil by hand.
- Installation of crushed stone base with a seal of 100 mm.
- Installation of concrete preparation of 100 mm.
- Installation of the foundation strip height of 300 mm reinforced with 2 reinforcement mesh depth of 1.2 meters (formwork, metal frame, concrete).
- Installation of foundation walls of the blocks FBS or monolithic ZHB.
- The device is a monolithic zone under the main walls.
- Installation of vertical obmazochnoy waterproofing in 2 layers.
- Insulation of walls of the foundation.
- Backfilling with layer multiplexing.
- Crushed stone sub-crust under the slab floor of the first (ground) floor.
- Setting of sewer pipes under the slab floor.
- The device is a monolithic ZHB floor plate 1 st (basement) floor.
Masonry walls and partitions, installation of monolithic zones, installation of ceilings.
- Laying the warm exterior walls * of the ceramic block "POROTERM 38 P + W" - durable and environmentally friendly material from Europe. * - The walls do not require insulation (Therefore, according to new rules insulation of buildings, DBN B.2.6-31: 2006).
- Masonry internal walls of ceramic bricks 2NF thickness 250-380mm.
- Installation of ceiling tiles from the ZHB, the device monolithic sections.
- Installation of ceiling under the attic of the wooden beams (in the attic roof).
- Brick masonry chimney of brick type M-125.
- Installation of monolithic ZHB jumpers.
- Masonry walls of ceramic bricks 2NF thickness of 120 mm.
- The device is a monolithic reinforced concrete belts.
- Installation of prefabricated bridges.
- Thermal insulation of thermal bridges in places jumpers, belts, floor slabs.
Roofing.
- Ognebiozaschita wooden elements.
- Installation of the truss system.
- The device evrobarera JUTA, parobarera, insulation ISOVER 200mm (in the roof tops).
- Installation of an exclusive metal "METROBOND" or shingles (your choice).
- Installation of plastic gutter system.
- Soffit overhang roof siding.
Facade work
- Masonry facade environmental insulation plaster "Teplover.
- Decorative plaster, facade cladding and ground tiles, ornamental elements of the facade of polystyrene.
- Installation of windows and balcony doors of metal-profile KBE with energy saving glazing.
- Installation of metal entrance doors and sectional garage doors.
Engineering Systems
- Installation of water systems, wiring for hot and cold water composite pipes.
- Installation of the sewage system of metal plastic pipes.
- Installation of heating system, the device internal networks (metal-pipe hot water heating, radiators, water heated floors in the bathrooms)
- Electrical - wiring copper power cables.
Internal work
- Thermal insulation of floors, finishing screed device for laying floor coverings.
- Plaster walls for final finishing.
- Plaster ceilings for final finishing.
- Installation of the metal framework under the stairs trim a tree.
Organization of the construction site.
- Placement of building cabins, mortar site, welding generator.
- Provision of building a cottage with all the necessary tools and mechanisms.
- Debris removal on completion of works.
The contract does not change until completion. Payment is made uniformly in the course of the construction schedule of financing.
Payment in UAH according to the exchange on the date of payment.
Perhaps the implementation of one of the stages of construction (foundations, ground part, the roof).
This is an actual construction cost for the completion of the entire territory of Ukraine except for seismic regions (the Crimea and Carpathians), high floor of a clean floor to ceiling not exceeding 3 meters, and provided a simple geology (solid strip foundation depth of 1.2 m). In terms of other materials and design solutions - the cost is adjusted accordingly.
Implementation period 6 - 12 months depending on the size of the object.
Guarantee works - 2 years! A good guarantee of quality of work completed, will serve as feedback from our customers. We invite you to view the completed projects and objects at the implementation stage.
And finally, 2 important rules in the design and construction:
1. One dollar saved means to the project - $ 10 additional cost in construction.
2. Construction is not cheap, cheap construction - a sad result (as the majority of private cottages on display today at the sale in our country

Complete set 3 (house with fixtures and equipment)
Floors, walls, ceilings, stairs, installation of interior doors, installation of equipment for water supply, sewerage, heating, ventilation, installation of electrical and low voltage systems.
from 5000 grn/m2 *

Price depends on the complexity of the project and the materials used. Depending on the amount of work and many objective reasons, which are determined only after a thorough acquaintance with the subject, these prices may vary.
Construction time "box" cottage with a foundation - from 3 months.
Territory.
Enclosure area (fence, gates), small form, benches, paths, driveways, laying turf, planting trees, shrubs, flower beds breakdown, the lighting device area.
from 8000 USD / Weaving **


Note:
* - Per square meter total area of the house (the sum of the total area).
** - Per hundred square meters (100 m2) plot.
Payment is made in the national currency of Ukraine, in stages in accordance with the schedule of funding, signed by the Customer and the Company.
And finally, 2 important rules in the design and construction:
1. One dollar saved means to the project - $ 10 additional cost in construction.
2. Construction is not cheap, cheap construction - a sad result (as the majority of private cottages on display today at the sale in our state).

We offer quality at a reasonable price

PRICES FOR CONSTRUCTION WORK SSF CNG(at 20.02.10):

NAME OF WORK EARTHMOVING

MSR.

Cost of work in UAH.

1.

BREAKDOWN, SCHEDULING, MAPPING

m2

15-20

2.

Excavation MANUAL

m3

70-100

3.

Trimmed vegetation BULLDOZER THICK to 250 mm.

m3

35-50

4.

Excavation of mechanical devices to loading on vehicle

m3

40-50

5.

EXPORT DRAWN TO GROUND RANGE TRANSPORT

m3

from 40

6.

Earth moving MANUAL ON THE TERRITORY with leveling and compaction

from 50

7.

Backfill soil with layerwise ramming

m3

30-50

8.

SAND thick pad with a layout SITE BULLDOZER

m3

от 20

9.

Mechanized earth moving at a distance of 100 M

t

от 25

1 0.

Calls for a bottom and sides of trenches and foundation pits MANUAL

m2

20-50

1 1.

STRUCTURE OF REASONS AND SAND BAG HAND

m2

15-25

1 2.

DEVICE FOR Alignment Ties Oaklake rolls WATERPROOFING thicknesses up to 30 MW.

m2

15-25

1 3.

CLEANING THE BASEMENT brush with grouting SOLUTION FOR waterproofing

m2

20-25

1 4.

DEVICE gravel BASE

m2

15-25

2. FOUNDATION

1.

DEVICE PREPARATION FROM thick concrete 100 mm.

m3

200-300

2.

Monolithic concrete basement under the columns, with installation of formwork, 3 m

m3

400-500

3.

Installation of monolithic reinforced concrete foundations PLATES FLAT with production of the reinforcement cage and Formwork, Concreting

m3

250-400

4.

Installation of monolithic reinforced concrete strip foundations with laying and viscous FRAME, assembling and dismantling formwork boards Concreting

m3

300-400

5.

GEAR SOLID CONCRETE FLANGES, jumpers with laying and viscous FRAME, assembling and dismantling formwork boards, Concreting

m.

70-100

6.

BACKFILLING nonmultiple place to brick

m2

от 120

7.

MANUFACTURING Pile foundations up to 300 mm of AC INSTALLATION OF PIPES, AND INSTALLATION OF VISCOUS reinforcement cage, preparation and pouring of cement
 rm.

от 500

8.

DEVICE monolithic reinforced concrete slab FLOOR 10-15 cm thick

m3

350-450

9.

RP masonry skirting board from brick under plaster-prepared SOLUTION

m3

от 400

1 0.

DEVICE FOR Alignment Ties Oaklake rolls WATERPROOFING thicknesses up to 30 MW.

m2 

15-25

1 1.

VERTICAL BASEMENT WATERPROOFING bitumen with the mixture is heated

m2

от 20

1 2.

Waterproofing WALL rolls (1 layer)

m2

от 30

1 3.

Waterproofing WALLS, rolls (2 layers)

m2

от 40

1 4.

ISOLATION flat and curvilinear surfaces of mineral wool products

m2

от 30

1 5.

DEVICE ISOLATION Sediment from expanded clay

m3

от 60

16.

 Installation is ready Stairs

p. 

от 12 0

17.

Concreting of the pool thickness of 300 MW. With reinforcement, setting and removing formwork

m3

от 600

18.

Fabrication and installation of trays ACCEPTANCE OF CONCRETE

m

40-50

19.

 MANUFACTURING Rounded FORMWORK

m2

от 50

2 0.

FILLING interunit space SOLUTION

90-100

2 1.

INSTALLATION Foundation blocks

p.

60-80

2 2.

DEVICE reinforced concrete sections with preparation of concrete, Formwork, reinforcement

p. 

от 200

3. Ceilings

1.

INSTALLATION slabs with anchoring and grouting

m2

50-70

2.

Installation of monolithic LOTS (Formwork, reinforcement, concreting)

m2

от 200

3.

LAYING beams of AMIS until 1T

p.

от 90

4.

Columns mounting in a glass rectangular foundations, masses of the colonies TO 1T

p.

от 110

5.

 LAYING jumpers AMIS until 1T

p.

от 70

6.

FILLING interplate sutures SOLUTION

m .

от 70

7.

DEVICE monolithic concrete floor slabs (Formwork, reinforcement, concreting) with an increased STOREY APPLY TO = 1,2

m2

150-300

8.

DEVICE wooden floors (construction)

m2

от 60

9.

Flooring boards

m2

от 70

10.

DEVICE Crate CEILING

m2

от 50

11.

Filing Lining CEILING OPEN

m2

от 80

12.

 Filing CEILING Lining HIDDEN

m2

от 80

4.WALLS

1.

Masonry external walls from concrete blocks

m3

250-300

2.

Masonry exterior walls made of large tile (POROTERM etc.)

m2

250-350

3.

Masonry walls made of facing brick

m2

120-180

4.

Masonry exterior walls of brick (thickness of 0,5 M)

m2

320-400

5.

Masonry exterior walls of brick with a heater and wall Facing bricks

m3

580-700

6.

Masonry internal partitions of brick (1 / 2)

m2

80-100

7.

INSTALLATION Composed Jumper

p.

от 70

8.

DEVICE Air ducts in masonry

m3

400-600

9.

Bricklaying POSTS FROM BRICK Facing Brick

m2

150

10.

INSULATION WALL USING clipped Gribkov

m2

от 30

11.

FACING WALLS OF STONE

m2

от 120

12.

Turning Corner

m2

от 110

13.

Masonry Beam

m2

от 210

14.

Wooden Crates to the walls

m3

от 60

15.

Cording Crate FILM

m2

от 10

16.

FILLING SPACE with Heater

m2

от 40

17.

Paneling Lining

m2

от 100

18.

Spotting Crate UNDER Siding

m2

от 70

19.

FINISH WALL Siding

m2

от 100

5. STAIRS

1.

MANUFACTURING AND ASSEMBLY The stairs (FORMWORK, reinforcement, concreting):

2.

PLAYGROUND

m2

от 2350

3.

STEP

p.

от 1000

4.

STEP BUTTERFLY

p.

от 1350

5.

Wooden Stairs:

6.

 PLAYGROUND

m2

от 1556

7.

STEP DIRECT

p.

от 1000

8.

STEP BUTTERFLY

p.

от 1175

9.

INSTALLATION balusters

m .

от 1320

10.

FACING STEPS 1 m wide:

11.

TILE

p.

от 870

12.

STONE

p.

от 957

13.

Wood (PARQUET)

p.

от 1595

6. ROOFING

1.

Manufacture and installation of SIMPLE ROOF

m2

от 60

2.

Roof framing system

m2

от 60

3.

DEVICE Crate

m2

от 30

4.

INSULATION ROOF mineral wool

m2

от 35

FLOORING ROOFING MATERIAL:

-

EVROSHIFER

m2

от 35

-

Metal

m2

от 60

-

Rolled roofing

m2

от 90

-

Ceramic tile

m2

от 120

5.

BOX ventilation ducts

p.

от 100

6.

INSTALLATION skylights

p.

250-500

7.

 Installation of the system de-icing

m. 

от 160

8.

 Filing WIND STRIPS (Direct)

m.

от 35

9.

 Filing WIND STRIPS (oblique)

m.

от 70

10.

Filing siding shelves (80 cm)

m.

от 80

11.

Drains HORIZONTAL MOUNTING

m.

от 35

12.

INSTALLATION OF VERTICAL Drains

m.

от 40

13.

 Pavement tide, Firewall, Parapet

m.

от 45

7. FACADE

1.

Scaffolding

m2

от 20

2.

 DISMANTLING ALTITUDE FORESTS

m2

от 10

3.

Plastering FACADE

m2

от 90

4.

Plastering RUST STRAIGHT

m.

от 35

5.

Plastering Rounded RUST

m.

от 45

6.

Plastering Corner

m.

от 35

7.

Plastering SLOPES

m.

от 90

8.

MANUFACTURER DIRECT

m.

от 40

9.

MANUFACTURER Rounded

m.

от 50

10.

Decorative plaster facade painting

m2

от 60

11.

PAINTING RUST

m.

от 40

12.

PAINTING SLOPES

m.

от 40

13.

MANUFACTURING RUST IN Cap

m.

от 50

14.

FACING RUST TILES

m.

от 55

15.

INSTALLATION Ebb

p.

от 60

16.

INSTALLATION trim strips

m.

от 45

17.

Fabrication and installation of Decorative wooden beam structures with GRINDING antique and coating varnish

m.

от 120

Planned savings - 10% of the cost of
Depreciation Electromechanical tools for working - 3-5% of the cost of materials
Transportation costs - 5-10% of the cost of materials
In the price you specify an average price. Depending on the size and complexity of the work the price may change as the big and the smaller side

Prices are for cash. When non-cash payments to the cost of work is added 20% VAT



3 June, 2011 
...

27 May, 2011 
...

20 May, 2011 
...

13 May, 2011 
...

10 May, 2011 
...
|  About Us   |   Cost of work   |   Services   |   Photogallery   |     |   Jobs   |   Partners   |   News   |   Contact Us   |  
Copyright 2009 В© CNG.
   Деревянные дома
АИМ ПаНов - Раскртука сайта